LIST OF ACTIVITIES-Northern Division WD-5-As on 30.09.2007

List of activities for the month of september 2007 N.D.-4

OFFICE OF THE EXECUTIVE ENGINEER (HQ)-QUALITY ASSURANCE CELL(DETAILS OF PENDING DISPOSAL CASES AS ON 1.09.07)

List of activities N.D.-12

Details of temporary allotment of park Dr. Hedguwar park saraswati garden for the month of october

Details of temporary allotment of park Dr. Hedguwar park saraswati garden for the month of november

Details of temporary allotment of park Dr. Hedguwar park saraswati garden for the month of september

Details of temporary allotment of park Guru teg bahadur park Lawn No. 2 for the month of november

Details of temporary allotment of park Guru teg bahadur park Lawn No. 2 for the month of october

Details of temporary allotment of park Guru teg bahadur park Lawn No. 2 for the month of september

Details of temporary allotment of park Guru teg bahadur park Lawn No. 1 for the month of november

Details of temporary allotment of park Guru teg bahadur park Lawn No. 1 for the month of october

Details of temporary allotment of park Guru teg bahadur park Lawn No. 1 for the month of september

Northern Division No. 8-List of Activities

ELECTRICAL DIVISION NO.7-DEVIATION STATEMENT 2-7-07 onwards

T.L.B.O/CAU/NZ/DDA/151

T.L.B.O/CAU/NZ/DDA/150

T.L.B.O/CAU/NZ/DDA/149

T.L.B.O/CAU/NZ/DDA/146

T.L.B.O/CAU/NZ/DDA/145

T.L.B.O/CAU/NZ/DDA/144

T.L.B.O/CAU/NZ/DDA/143

T.L.B.O/CAU/NZ/DDA/142

T.L.B.O/CAU/NZ/DDA/141

T.L.B.O/CAU/NZ/DDA/140

T.L.B.O/CAU/NZ/DDA/139

T.L.B.O/CAU/NZ/DDA/138

T.L.B.O/CAU/NZ/DDA/137

T.L.B.O/CAU/NZ/DDA/135

T.L.B.O/CAU/NZ/DDA/136

T.L.B.O/CAU/NZ/DDA/134

T.L.B.O/CAU/NZ/DDA/133

T.L.B.O/CAU/NZ/DDA/132

T.L.B.O/CAU/NZ/DDA/131

T.L.B.O/CAU/NZ/DDA/130

T.L.B.O/CAU/NZ/DDA/129

T.L.B.O/CAU/NZ/DDA/128

T.L.B.O/CAU/NZ/DDA/127

T.L.B.O/CAU/NZ/DDA/126

T.L.B.O/CAU/NZ/DDA/125

T.L.B.O/CAU/NZ/DDA/124

T.L.B.O/CAU/NZ/DDA/123

T.L.B.O/CAU/NZ/DDA/122

T.L.B.O/CAU/NZ/DDA/121

T.L.B.O/CAU/NZ/DDA/120

T.L.B.O/CAU/NZ/DDA/119

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of july-2007] Ground No -Ist

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of august-2007] Ground No -Ist

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of september-2007] Ground No -Ist

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of october-2007] Ground No -Ist

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of november-2007] Ground No -IIIrd

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of november-2007] Ground No -IInd

Detail of temporary allotment of dusshera ground at janakpuri block B [Month of november-2007]

Detail of temporary allotment of c4-G park(opp kadimi restaurant) at janakpuri block C [Month of september-2007]

F-11(7)/06/CE/NZ/DDA/117-Proforma of Monthly Report to be Submitted to Vigilance Department

Statement showing the Position of Temporary Booking of Vacant lands inN.Z. for holding of religious /social marriage functions during 1-9-07 to 15-9-07

T.L.B.O/CAU/NZ/DDA/103

T.L.B.O/CAU/NZ/DDA/104

T.L.B.O/CAU/NZ/DDA/105

List of water Bodies-South West Zone

COMPLETION CERTIFICATE-HORTICULTURE DIVISION NO-VII-South West Zone

LIST OF HOUSES LYING VACANT AS ON 30.06.2007-South West Zone

POSITION OF VACANT COMMERCIAL PLOTS AS ON 30.6.2007-South West Zone

POSITION OF VACANT COMMERCIAL PROPERTIES AS ON 30.06.2007- SOUTH WEST ZONE

Streamlining of the procedure of Temporary Allotment of land-OFFICE OF THE CHIEF ENGINEER(SWZ)-South West Zone

AREA WHERE SERVICES ARE TO BE HANDED OVER TO MCD/DJB ALONGWITH DETAILS OF DEFICIENCY CHARGES

ABSTRACT REPORT FOR DETAILS ON RAIN WATER HARVESTING

MAJOR PROJECTS HELD UP DUE TO COURT CASE UPTO JULY-2007-(SOUTH WEST ZONE)

NEW SCHEMES OF D.D.A.

Incumbency of Staff working in Chief Engineer (SWZ)’s office

PRESENT STATUS OF WORKS AS ON AUGUST – 2007

DETAIL OF LAND HANDED OVER/YET TO BE HANDED OVER TO ENGINEERING WING FOR DEVELOPMENT

TEMPORARY ALLOTMENT OF COMMUNITY HALLS FOR SOCIAL FUNCTIONS-SOUTH WEST ZONE

HORTICULTURE DIVISION NO-VII(COMPLETION CERTIFICATE)

Status Report As on 31.08.2007 Dy. Dir(Hort.-II), Rama Market,Pitampura

Position as on 01.09.07(RTI Cases – Appeal Cases)[Pertaining to Systems Wing – Appellate Authority, Commr(Systems)]

PROFORMA FOR MONTHLY REPORT TO BE SUBMITTED TO VIGILANCE DEPTT

Detail of pending cases as on 31/08/07

TLBO/CAU/NZ/DDA/99 DT. 6-9-07

Court Case, Progress report - August, 2007. ED-1/DDA

NOTES TO THE ACCOUNT

PENSION FUND - DELHI DEVELOPMENT AUTHORITY

GRATUITY FUND - DELHI DEVELOPMENT AUTHORITY

DDA EMPLOYEES' GENERAL PROVIDENT FUND ACCOUNT

STATEMENT SHOWING INVESTMENT MADE UNDER SECTION 23(3) OF DDA ACT AS ON 31.03.05

STATEMENT OF SIGNIFICANT ACCOUNTING POLICIES

CDO CIRCULARS

Court Cases of STORE DIVISION-I

Court Cases of STORE DIVISION-2

Present Status of work Elect.10 DDA 2007-2008 05.09.2007

Statement showing the Position of Temporary Booking of Vacant lands inN.Z. for holding of religious /social marriage functions during 16-8-07to31-8-07

NORTHERN DIVISION NO. 11-LIST OF VARIOUS ACTIVITIES

OFFICE OF THE EXECUTIVE ENGINEER / NOTHERN DIVISION No. 5 -COMPLETION OF DATA FOR ACTURIAL VALUATION OF PENSIONARIES BENEFITS

Material Management

OFFICE OF THE DIRECTOR (MM)-LOCATION OF FIRE FIGHTING EQUIPMENT

HORTICULTURE DIVISION NO-7-STATEMENT OF PENDING FINAL BILLS AND NON REFUND OF SECURITY DEPOSIT

HORTICULTURE DIVISION NO-7-STATEMENT OF PROJECT HELD UP DUE TO COURT CASES

HORTICULTURE DIVISION NO.-VII-STATEMENT SHOWING THE CATEGORY SANCTIONED STRENGTH MAN IN POSITION AND VACANT POST OF REGULAR STAFF IN HORT.DIVN.-VII.

HORTICULTURE DIVISION NO-VII-COMPLETION CERTIFICATE

HORTICULTURE DIVISION NO-7-MONTHLY PROGRESS REPORT OF HORTICULTURE IN R/O HORTICULTURE DIVIISON NO-VII, DDA UPTO JULY –2007

HORTICULTURE DIVISION NOVII-WATER BODIES

Northern DIVISION NO.4-LIST OF VARIOUS ACTIVITIES

OFFICE OF THE EXECUTIVE ENGINEER-NORTHERN DIVISION NO. 9[LIST OF ACTIVITIES]

Office of the S.E(P)VI South East Zone, Shahpurjat

Schedule of Disiplinary Authority

NORTHERN DIVISION NO.10-LIST OF VARIOUS ACTIVITIES

ANNUAL TRAINING CALENDER FOR THE YEAR 2007-08

Statement showing the Position of Temporary Booking of Vacant lands inN.Z. for holding of religious /social marriage functions during 1-8-07 to15-8-07.

DETAILS OF ACTIVITIES / WORKS DONE IN CIVIL CIRCLE NO. 7 W.E.F.1.4.2007 TO 31.7.2007

List of activities[Northern Division WD-5]

PROFORMA FOR MONTHLY REPORT TO BE SUBMITTED TO VIGILANCE DEPARTMENT

Material Management

OFFICE OF THE EXECUTIVE ENGINEER (HQ)-QUALITY ASSURANCE CELL[DETAILS OF PENDING DISPOSAL CASES AS ON 1.08.07]


Office of the Chief Engineer(SWZ)[LIST OF HOUSES LYING VACANT AS ON 30.06.2007 ]

Office of the Chief Engineer(SWZ)[POSITION OF VACANT COMMERCIAL PLOTS AS ON 30.6.2007 ]

Office of the Chief Engineer(SWZ)[POSITION OF VACANT COMMERCIAL PROPERTIES AS ON 30.06.2007 ]

Office of the Chief Engineer(SWZ)[STATUS OF LAND HANDED OVER/YET TO BE HANDED OVER TO ENGINEERING WING ]

Office of the Chief Engineer(SWZ)[AREA WHERE SERVICES ARE TO BE HANDED OVER TO MCD/DJB ALONGWITH DETAILS OF DEFICIENCY CHARGES ]

Office of the Chief Engineer(SWZ)[NEW SCHEMES OF D.D.A]

Office of the Chief Engineer(SWZ)[List Of Water Bodies]

Office of the Chief Engineer(SWZ)[Incumbency of Staff working in Chief Engineer (SWZ)’s office]

Office of the Chief Engineer(SWZ)[Approved A/A& E/S]

Horticulture Division NO.II [position of hort.II staff as per sanction strength on 31.7.07

ELECTRICAL DIVISION NO.11[PRESENT STATUS OF WORK,COURT CASES,FIRE FIGHTING EQUIPMENTS INSTALLED (NOS.) WITH LOCATION]

Horticulture division No II[progress report of work awarded during 2006-07 and 2007-08 upto 31.7.07]

List of Activities(ELECTRICAL DIVISION – 2 -ELECTRICAL CIRCLE -I)

APPROVED LIST AS ON 26.7.2007 OF STRUCTURAL CONSULTANTS IN DDA

ORGANISATIONAL SET UP OF CENTRAL DESIGN ORGANISATION

REDUCED ITEM STATEMENT, EXTRA ITEM STATEMENT , SUBSTITUTE ITEM STATEMENT & E.O. TIME [EE(Electrical Division-ED7)]

FLYOVER ELECT. DIVN. NO. 1[LIST OF CONTRACTOR’S WORKING WITH THIS DIVISION]

ANNEXURE-III[POSITION OF STAFF IN FOED-I]

DEVIATION STATEMENT 2-7-07 onwards[OFFICE OF THE EXECUTIVE ENGINEER ELECTRICAL DIVISION NO.7 KESHAV PURAM , DELHI]

Elect. DIVISION No.1 [Progress Report]

FLYOVER ELECT. DIVN. NO. 1(LIST OF CONTRACTOR’S WORKING WITH THIS DIVISION)

POSITION OF STAFF IN FOED-I

NORTHERN DIVISION NO. 5[LIST OF ACTIVITIES]

LIST OF ACTIVITIES (N.D. III/C.C.7/NZ/DDA)

PENDING COURT CASES / ARBITRATION CASES[ELECTRICAL DIVISION NO : 07-STATEMENT PENDIN COURT CASES FOR THE MONTE OF June 2007]

Pending final bill report[F.5(2)EE/Elect.Div.No.11/DDA/07-08/]

LIST OF ACTIVITIES[EE ND1]

STATUS OF NEW FLYOVERS TO BE TAKEN UP IN DELHI As on 20.07.07

Details of Pending Final Bills , works costing more than Rs.2.00 lacs ,deviations in works ,Restricted Call of Tenders ,Arbitration & Related Court Cases,of Court Cases pending ,EIS,EOT,Vacant Commercial Properties ,Position of Regular Staff [EE ND(5)]

STATUS REPORT IN R/O APPLICATION RECEIVED BOOKING OF SITES UNDER NORTH ZONE DDA (AS ON 30-6-2007)

S.NO.22 Jurisdiction of EE/ND2/MAP[Motia Khan]

Details of the area where services handed over to MCD and where Services yet to be handed over to MCD[Motia Khan]

Office of Executive Engineer Northern Division – II DETAIL OF ARBITRATION CASES[Motia Khan]

LIST OF COURT CASE[EE ND-2, Motia Khan]

CLAIMANT STATEMENT OF ARBITRATION AWARD FOR THE WORK 64 Three Bed room (Type III) 64 two bed room (Type II) Houses And 96 Scooter Garages under SFS at Pitampura Pkt 2. (Dakshini) AGREEMENT NO.4/EE/CD-VI/85-86 21/EE/ND-2/97-98[Motia Khan]

Elect.Circle-3, List of Pending High Court Cases

COURT CASES ND-12/DDA

DIVISION NO-12/DDA

List of Vacant Flats DIVISION ND12

List of Vacant Commercial Properties in Sector-B4, Narela

PROGRESS REPORT OF WORKS(COSTING LESS THEN 10 LACS UPTO 30.06.07

Progress of work[ND-12/DDA/Narela]

List of Acivities at sector G-8, pkt-II,Narela-27/EE/ND12/DDA/06-07, 36/EE/ND12/DDA/06-07; at sector G-8, Pkt-I,Narela 37/EEND12/DDA/06-07, 32/EEND12/DDA/05-06, 40/EEND12/DDA/06-07

List of Acivities in ND-12/DDA/NARELA

ELECTTRICAL DIVISION NO.11,PRESS BUILDING,VIKAS SADAN,INA No.F.5(2)EE/ED11/DDA/07-08/372

ELECTRICAL DIVISION–12/ELECTRICAL CIRCLE-I[List of Activities]

QUALITY ASSURANCE CELL

ELECTRICAL DIVISION NO. 9-DDA, ROHINI[LIST OF ACTIVITIES]

EM CIRCULARS

NORTHERN DIVISION NO.8-DDA, PITAMPURA, DELHI[LIST OF ACTIVITIES]

ELECTRICAL DIVISION NO. 8[LIST OF ACTIVITIES]

APPLICATION FOR EXTENSION OF TIME PART – 1

WORKS COSTING MORE RS. 2,00 LACS OR ABOVE

ELECTRICAL DIVISION NO : 07 STATEMENT PENDING COURT CASES FOR THE MONTE OF June 2007

FIRST AND FINAL BILL (Central P.W.A Code Paragraphs 10-2-10 & 10-2-11)

OFFICE OF THE EX.NGINEER ELECTRICIAL DIVISION NO.7 KESHAVPURAM - FINAL BILL

ELECTRICAL DIVISION NO.4, ROHINI [Reports]

ABSTRAT OF REGULAR STAFF STRENGTH IN ELECT. ZONE

Monthly Report in r/o Reply of OMs pending for more than 60 Days(Ending October 2006)

ELECTRICAL DIVISION – 2 / ELECTRICAL CIRCLE -I[Progress Report ]

Court case of Elect. Div. No.10

ELECTRICAL DIVISION – 5 / ELECTRICAL CIRCLE -I[List of Activities]

ELECTRICAL DIVISION NO.-4, ROHINI[DETAILS OF PENDING FINAL BILLS ,NON-REFUND OF SECURITY DEPOSIT ,PRESENT STATUS OF WORKS ,DEVIATIONS,RESCINDED WORKS,STATEMENT OF PENDING COURT CASES ,OF RIS / EIS/ EOT CASES ,STAUS REPORT OF HANDING OVER OF SERVICES OF 146 COLONIES ,STAUS REPORT OF HANDING OVER OF 163 COLONIES]

[FINANCE & ACCOUNTS WING] REVISED ESTIMATES FOR 2006-07 & BUDGET ESTIMATES FOR 2007-2008

RULES OF ENLISTMENT FOR CONTRACTOR’S IN D. D. A. 2002

STATUS OF FLYOVERS AND ROB/RUB’s ON RAILWAY LEVEL CROSSING TO BE TAKENUP AGENCYWISE IN DELHI As on 10.4.2007

CONTRACTORS REGISTERED WITH DDA (CLASSWISE) CLASS – V

CONTRACTORS REGISTERED WITH DDA (CLASSWISE) CLASS – I - CLASS – IV

Form to get Advanve Money for Festival

Statement of Movable Property

The Gazette of India

The Gazette of India Extraordinary

Application for Leave

FORM 12

FORM to get NOC for issuing of Passport

FORM 14

FORM B

FORM C

FORM TO GET ADVANCE MONEY FOR MOTOR CAR / CYCLE

FORM TO GET ADVANCE MONEY FOR PURCHASING FAN

FORM TO GET ADVANCE MONEY FOR PURCHASING CYCLE

FORM OF APPLICATION FOR FINAL WITHDRAWAL

FORM TO GET ADVANCE MONEY FROM PROVIDENT FUND

circulars(1) land costing wing

circulars(2) land costing wing

Quality Assurance Manual

Statement of Immovable Property

FORM FOR GIVING PRIOR INTIMATION UNDER RULE 16(3)OF THE DDA CONDUCT DISCIPLINARY & APPEAL REGULATIONS-1999 FOR TRANSACTION IN RECEIPT OF MOVEABLE PROPERTY

RTI cases of Systems Wing[Position as on 01.07.07]

Functions of Staff Quarters Allotment Branch

Functions of Nazarat Branch

PENDING CONVERSION CASES OF LEASE ADMINISTRATION BRANCH (HOUSING) AS ON 28.02.07

Rohini Brochure

Circulars/orders on composition fee

Circular No. F.1(2)2002/AO®Misc./Pt./51

Form II A of Appellate Authority from Chief Architect for quarter ending september 2006 and december 2006

Manual of DDA under Personnel Department.

Pertaining to Personnel Branch P.I.O. (DIRECTOR PERSONNEL)

Status of applications and Appeals under RTI ACT from 12.10.05

Appleals to Appellate Authority FA(H) dt. 15.12.06

Quarterly summary of Appellate authorities for (Public Authority) for quarter ending December ‘05

BUDGET AND ACCOUNTS RULES, 1982

Quarterly Summary of Appellate Authorities for (CDO / DDA) for quarter ending June, 2006

VAT

Delegation of Powers

  1. Circular No. 173

  1. Circular No. 167

  2. Circular No. 169

  3. Circular No. 170,172,175

  4. Circular No. 171

  5. Circular No. 1-20

  6. Circular No. 21-50

  7. Circular No. 51-100

  8. Circular No. 101-125

  9. Circular No. 125-149

  10. Circular No. 150

  11. Circular No. 151

  12. Circular No. 157

  13. Circular No. 161

  14. Circular No. 162-166

  15. Circular No. 168

  1. Circular No. 20

  1. Circular No. 1-19

  2. Circular No. 24

  3. Circular No. 24/CDO

  4. Circular No. 20,21,22,23

  5. Circular No. 24

  6. Circular No. 27

  7. Circular No. 28

organisation chart of engineering wing

Details regarding the formation of Screening Committee

The Gazette of India

legal organisation chart.

REVISED ESTIMATES FOR 2005-06 & BUDGET ESTIMATES FOR 2006-2007

Work distribution in Vigilance Deptartment

Housing and Urban Projects Wing

Duties and powers of the officers posted in CDO

Composition of Committee in the Planning Department

Application form for Information under RTI Act

Pay Scale of Group-A and Group-B Officers of DDA.

BUDGET [DELHI DEVELOPMENT AUTHORITY]

LAND COSTING WING

DDA's Endeavour Towards Heritage of Delhi

Anglo Arabic

Lado Serai

Organizational Chart of Director(MM)

Organizational Chart of CDO

Narela Project Planning Unit

Traffic & Transportation Unit

HAND BOOK BUILDING PERMIT PROCEDURE 2006

DELEGATION OF POWERS

FUNCTIONS, DUTIES & NORMS IN THE PLANNING DEPARTMENT

CITIZEN'S CHARTER

 

 
   
  DDA at a Glance  
  Achievements  
  Charter  
  Organizational Chart  
  Annual Admin Report 03-04  
  Annual Admin Report 04-05  
  Public Information Officers & Appellate Authority  
  Right To Information Act 2005  
  Telephone Directory  
  CPWD Manuals  
  EM Circulars